GROUND CONDITIONS. REASSESS. REBUILD.

Post-Earthquake Ground Investigation in Myanmar

Ground investigation, boreholes, in-situ testing and targeted geophysics help assess earthquake-affected sites in Myanmar and inform engineering decisions for repair and reconstruction.

POST-EARTHQUAKE GROUND ASSESSMENT

Understand the ground before designing repairs.

The March 2025 earthquake near Mandalay affected buildings, transport links and essential infrastructure across central Myanmar. Damage visible above ground does not by itself establish the condition of buried foundations, fill, saturated deposits or retaining systems. A defined geotechnical investigation can help engineers test the ground model instead of relying on assumptions.

Ground conditions

Mandalay & Sagaing

Evaluate foundations, near-surface disturbance and groundwater-sensitive ground in affected urban and infrastructure corridors.

Recovery works

Nay Pyi Taw & Bago

Consider access, existing records and the consequences of differential movement during repair and redevelopment.

Engineering decisions

Site-by-site scoping

The right level of investigation depends on damage observations, ground history, available records and the intended remedial design.

WHY FIELD VERIFICATION MATTERS

Earthquake damage can hide ground-related failure mechanisms.

Liquefaction, cyclic softening, differential settlement, lateral spreading and slope instability can alter foundation support. Seismic hazard maps help identify potential areas of concern, but a specific site needs direct observation and appropriate testing before conclusions can be drawn.

Seismic ground response

Potential liquefaction

Review loose saturated deposits, sand boils, lateral movement, settlement and relevant historical groundwater conditions.

Ground–structure interaction

Foundation distress

Examine differential settlement, tilting, cracking and the influence of variable soils beneath existing foundations.

Ground movement

Slope and embankment instability

Investigate scarps, tension cracks, disturbed fill, drainage pathways and whether subsequent rainfall may affect stability.

PROJECT-BASED INVESTIGATION

Select the tests that answer the design question.

GEOUE supports the technical planning and coordination of investigation programmes appropriate to access, structural condition, subsurface uncertainty and expected construction works. Field testing and drilling arrangements are agreed against project conditions, available personnel and applicable requirements.

  • Desk study, reconnaissance and mapping of visible ground distress
  • Borehole logging with appropriate sampling and Standard Penetration Testing where applicable
  • Groundwater observations, standpipes or piezometers where relevant
  • Laboratory classification and engineering tests on representative soil and rock
  • Targeted geophysical methods to complement—not replace—boreholes
  • Defined factual reporting and interpretation for the responsible design engineer

INVESTIGATION METHODS

Combine methods according to evidence and site constraints.

No single instrument or test reveals all ground conditions. A useful programme matches each question to a measurable property and verifies interpretations against direct evidence.

QuestionPossible methodPractical limitation
Where are the layers and weak horizons?Boreholes, logs, sampling, in-situ testsSparse holes may miss local changes.
Could saturated soils be vulnerable to liquefaction?SPT/CPT where feasible, grain size, groundwater dataSusceptibility is not proved by one reading.
Is a buried anomaly or void suspected?ERT, GPR or selected geophysicsResolution depends on ground and site conditions.
Is groundwater affecting excavation or repairs?Standpipes, piezometers, staged readingsLevels vary over time and require interpretation.
Has the ground continued to move?Settlement benchmarks, inclinometers or surface surveyA consistent baseline and stable control are essential.

FROM SCOPE TO ENGINEERING DATA

A disciplined sequence for restoration projects.

Review the existing damage and records, plan access and test locations, document fieldwork, validate field and laboratory data, then present uncertainties clearly. The investigation should feed into the structural and geotechnical design process rather than substitute for it.

Scope

01 — Define

Discuss structure type, damage, anticipated repairs, access restrictions and investigation questions.

Fieldwork

02 — Investigate

Coordinate suitable sampling, in-situ testing, groundwater checks and optional geophysics.

Engineering

03 — Evaluate

Check data quality, reconcile the ground model and identify uncertainties needing further assessment.

Deliverables

04 — Report

Provide factual logs and a technical summary for the responsible project designers.

ENGINEERING DELIVERABLES

Evidence that can be used in repair planning.

A deliverables package may include investigation logs, georeferenced test positions, laboratory records, groundwater measurements, a subsurface profile, material characterization and a list of unresolved ground risks. Final testing quantities, reporting format and design responsibility are agreed with the project team.

  • Investigation plan and method statements, where requested
  • Borehole records, field test and sampling registers
  • Laboratory testing schedules and result tables
  • Groundwater readings with observation dates
  • Interpreted ground model with stated uncertainty
  • Recommendations for supplementary testing or monitoring where warranted

QUESTIONS FROM PROJECT TEAMS

Frequently asked questions.

Can geophysical scanning replace boreholes?
Not usually. Geophysical measurements are indirect; boreholes or other direct observations are generally needed to ground-truth critical interpretations.
Can an investigation certify a damaged building as safe?
No. Ground investigation informs the relevant engineers. Structural safety, occupancy and repair approval require separate competent assessment and the applicable approvals.
Is a borehole always necessary?
Not for every scope. The required information depends on the structure, damage symptoms, prior records, site access and the proposed intervention.
What should be sent for a quotation?
Site location, photographs, available foundation and geology records, scope of proposed repair, access conditions, drawings and any tender specification.

REFERENCE MATERIAL

Engineering references and published guidance.

The following independent sources provide background for engineering discussion. They do not represent projects carried out by GEOUE or substitute for the requirements of the applicable project authority.

USGS — 2025 Mandalay earthquake ground failure

Event information and regional liquefaction/landslide screening; estimates are not site-specific conclusions.

Read the original source ↗

World Bank — Myanmar earthquake recovery context

Published information on the scale of earthquake damage to buildings and infrastructure.

Read the original source ↗

UN-Habitat Myanmar — Post-Disaster Rapid Damage Assessment

Myanmar field assessment context for buildings; rapid assessments are distinct from detailed engineering verification.

Read the original source ↗

FHWA — Structural foundations

Technical guidance for transportation foundations and relevant field quality processes.

Read the original source ↗

DISCUSS YOUR PROJECT

A clear scope is the first step to useful engineering data.

Send your site location, scope, drawings, available records, access constraints and expected programme to info@geoue.com. GEOUE can review the technical requirements and discuss a practical project approach.

Explore related capabilities:

Scroll to Top